Select Page

Add hardware – start with your hub, then sensors

Write where each sensor goes on the sensor body with a sharpie

If you have shutoffs, add them BEFORE you install them into the plumbing, so you can validate everything works.  Here’s how you tell the system to turn off the water when a sensor detects moisture